The 2nd floor walls are each lifted from the ground to the 2nd
floor using a forward-reach forklift.
|
|
|
|
First, place the wall panel on the forward-reach forklift. |
|
|
|
|
|
|
|
|
Deposit the wall panel on the 2nd floor. |
|
|
|
|
|
|
|
|
Carry the wall panel to its proper place. |
|
|
|
|
|
|
|
|
Stand-up the panel (carefully !). Don't let go ! |
|
|
|
|
|
|
|
|
Keep doing it for all 17 wall panels. |
|
|
|
|
|
|
|
|
Leave out the last 2 wall panels so that the roof trusses can be lifted up easier. |
|
|
|
|
|
|
|
Click on any picture for larger version.