Click on any picture for larger version.
|
|
|
|
Liner for the "wetlands" septic field (evapotranspiration and nitrate removal) installed. |
|
|
|
|
|
|
|
|
Telephone poles, separate from power poles, are installed. |
|
|
|
|
|
|
|
|
The permanent power connections are made. |
|
|
|
|
|
|
|
|
Now we can turn on a light in the house! |
|
|
|
|
|
|
|
|
Freeze-proof faucet installed at future barn site. |
|
|
|
|
|
|
|